Location: Tower Bridge Road, Southwark, SE1
Client: Design International
Project Length: 8 weeks
Challenges: The key to this successful project was fully specified and accurate drawings. Once we stripped out the existing, we ensured the structure of the bathrooms were true and level so we could finish off exactly to the plans. The 3m high WC doors add a bit of luxury to the project and the shadow gaps give it an architectural feel.
Work Carried Out: