This site uses cookies. You can read how we use them in our privacy policy.

Tower Bridge Road

Location: Tower Bridge Road, Southwark, SE1

Client: Design International

Project Length: 8 weeks

Challenges: The key to this successful project was fully specified and accurate drawings. Once we stripped out the existing, we ensured the structure of the bathrooms were true and level so we could finish off exactly to the plans. The 3m high WC doors add a bit of luxury to the project and the shadow gaps give it an architectural feel.

Work Carried Out:

  • Strip out and waste clearance
  • 2 refurbished commercial bathrooms
  • 1 new glass meeting room
  • 1 new kitchenette
  • New tiled flooring including underfloor heating
  • Bespoke cubicle doors and frames
  • New lighting including emergency lighting
  • Shadow gaps to skirtings and ceilings
  • Decoration
  • New power and data points
  • Fire rated frameworks and doors
  • Fire stopping

Who We Work For

 

Want to know more?