Pitt Street

Location: Pitt Street, High Street Kensington, W8

Type: Residential refurbishment

Client: Private

Project Length: 6 weeks

Project Brief: Refurbishment and redecoration of shower area

Challenges: The building was occupied throughout the work and because the office was on the third floor, we ensured the lift and all common parts were protected and cleaned daily. In order to keep costs down, we re-used some of the existing glass panelling and inserted it into new walls.

Work Carried Out:

  • identification of leaking shower waste, inaccessible due to marble shower tray installation
  • removal existing glass enclosure
  • replacement of existing shower tray with a new bespoke shower and removable matching marble panel tray, to allow for straightforward access in future
  • supply and fit of new made-to-measure toughened glass enclosure
  • redecoration following completion of works
  • communication with occupants regarding the scope of works and access needed during the project