Location: Pitt Street, High Street Kensington, W8
Type: Residential refurbishment
Client: Private
Project Length: 6 weeks
Project Brief: Refurbishment and redecoration of shower area
Challenges: The building was occupied throughout the work and because the office was on the third floor, we ensured the lift and all common parts were protected and cleaned daily. In order to keep costs down, we re-used some of the existing glass panelling and inserted it into new walls.
Work Carried Out: